News
- 2011-08-19 11:25:35
-
California, USA has approved the project, including natural gas, combined cycle power generation equipment, integrated with the parabolic solar collector. Field of solar energy can produce about 10% of peak power.
The field of solar thermal energy will be provided directly to the heat recovery steam generator to produce steam, thus reducing the use of natural gas facilities.
Palmdale hybrid solar thermal and natural gas projects will be located in Los Angeles / Palmdale Regional Airport Northwest and U.S. Air Force Plant 42 333 acres of industrial land.
Palmdale plans to ensure that developers and power purchase agreement after the start of construction of the project.
California Energy Commission 4-0 vote proposed by the presiding member Tim Parr-generation hybrid program decisions.Califorma chief executive, said: "This project will provide reliable and stable power.
- [Return Home] [Print] [Go Back]
Search
Contact Us
Contact Person:
Mr. AnsonTel:
+86.138.23570117 (24H/7D)- +86.755.89316290
Fax:
+86.755.89316803Email:
info@jgnsolar.com- 13823570117@139.com
-






